« | » | |
Here the tank has been raised by one step. At this point it is resting on a 50-50 belnd of coarse dry sand and dry wood ash. That mix will act to stabilize the construction and aid in the walls drying. Previous Report Next Text © Neil Peterson, 2017 Photographs © Neil Peterson, 2017 Copyright details Contact us |