« | » | |
Down the neck of the smelter -- notice the line at 10 o'clock from the edge of the metal. Our supply of refractory cement was not enough to build the full height so a double layer of cobb was used at the top of the smelter. Previous Report Next Text © Neil Peterson, 2017 Photographs © Neil Peterson, 2017 Copyright details Contact us |