sml logo Dark Ages Re-Creation Company sml logo
Overview

Experimental Iron Production II - 2003


« large pic »
The air hose and viewing hole. The hose connects to the vacuum the end of the pipe (bottom right corner of the photo) has clear glass as a fitting. It can also be unscrewed so the pipe can be rodded out whenever it was blocked. The pipe extended 5 cm into the body of the smelter. There is a mark visible on the pipe which is 15 cm from the end.

Previous      Report     Next

Text © Neil Peterson, 2017
Photographs © Neil Peterson, 2017

Copyright details   Contact us