« | » | |
Showing the base construction. The smelter will be built just behind the concrete paving slab. The slab gives us a flat and stable work surface to mount the pipe tuyere. The front edge of the tapping pit is re-inforced with bricks. Next the grass cover will be removed just behind the slab and the soil stamped down to form the base for the smelter itself. Previous Report Next Text © Darrell Markewitz, 2017 Photographs © Karen Peterson, 2017 Copyright details Contact us |