« | » | |
Clay slab walls removed to about the top of the slag bowl level (1 layer of 3). The slag surface is exposed, but not cleaned of fine debris at this point. Previous Report Next Text © Darrell Markewitz, 2017 Photographs © Darrell Markewitz, 2017 Copyright details Contact us |