Location: Vinderheima
Premise/ Questions:
This is the second of two smelts to test these premises.
Smelter Type:
Diameter: | 9" (22.5 cm) | Stack above Tuyure: | 16" (40 cm) with 12" (30 cm) metal collar it totals 18" (70 cm) |
Tuyure Diameter: | 1" (2.5 cm) I.D. |
Tuyure Distance above floor: | 5.5" (13.75 cm) | Tuyure Angle: | 15° | Tuyure Penetration into stack (start/finish) | 3/4" (1.9 cm) / N/A |
Leader | Dave Cox |
Staff | Kevin Jarbeau, Ken Cook |
Recorder | Sam Falzone |
Reports of all of our iron smelting efforts along with more articles and information are available on the "Iron Smelting in the Viking Age" CD from the Wareham Forge. Copies of the CD can be purchased here. |
Total Charcoal | 92 lb (41.8 Kg) | Weight of Bloom | 3100 g (6.8 lbs) | Total Elapsed Time: | 3:25 to last charcoal added |
Total Ore | 52.6 lb (23.9 Kg) | Weight of Slag: | Bloom Quality |
As soon as the first team moved out of the smelt area, the
second team of Dave / Ken / Kevin got into action - the 'hot swap'.
First the remaining ignited charcoal scooped from smelt one was dumped
back into the furnace, with the remainder of stack filled with fresh
charcoal and the air blast resumed. Because of the retained heat in the
furnace, a couple of charcoal charging cycles were required to fully
ignite the working height of the smelter and return to the desired 8
minutes per standard bucket burn rate. Again the standard ore charging
sequence of seed charges / increasing volume of primary charges was
undertaken.
Because the small size of the initial bloom had confirmed in our minds
the low iron oxide content of the ore, it was decided to enrich the
second smelt by adding hematite blasting grit. That material is over 90
percent iron oxide, but can often cause problems because of its actual
lack of silica for slag formation. It was decided that mixing 50 % of
the rock ore with 50% of the hematite might create a more balanced
mixture of iron available inside the furnace. The method this team
chose to employ was to alternate rock ore with hematite scoop by scoop,
As the hematite is a bit more dense than the rock ore, the end result
was slightly more of the hematite making up the roughly 25 kg total ore
utilized over smelt two.
A significant secondary problem arose during the second smelt. The
initial patching of the furnace wall in the tuyere area before the
firing had been done with 'Blue Mountain Red' - a local ground clay
which has a relatively low firing temperature. Soon into the second
smelt, it was obvious that the smelter wall above the tuyere, but
within the supporting earthen bank, had burned through. Dramatic slumps
of the ash and sand packing mix on the tuyere side of the smelter
indicated large amounts of this material was falling into the furnace.
By keeping a quantity of this mix handy, it was possible to fill in the
developing hole. Over the course of the second smelt the better part of
a 20 litre pail of packing mix was consumed in this way. Mixing ash and
sand and then bringing it to the kind of heat existing in the interior
of a smelter (1100 C or more) results in the creation of glass. Huge
volumes of light glassy slag were being produced from this source
alone. Add that to the slag still in place from the first smelt, plus
any new slag being formed from the addition of high rock content ore
and it was obvious that slag volume was going to present a major
problem. The team had to undertake a number of fairly large slag taps
to keep the tuyere clear. Eventually the large volumes of glass being
created via the packing mix (going through what later proved to be a
fist sized hole) started to block of the tuyere.
Although not quite ready to extract the bloom in terms of an ideal
sequence, a sudden restriction in air flow lead to the decision to pull
the bloom. Because the smelter structure was not considered likely to
be recoverable, it was suggested to make a bottom extraction through
the tap arch. It proved difficult to pull out the bricks filling the
tap arch, as repeated slag taps had created a large mass of solidified
glass around them. Some close work with steel rod and hammer by Ken
broke up and cleared the bricks and exposed the original base layer of
charcoal fines and ash under the slag bowl. Kevin was then able to rake
clear the bottom of the bowl. This was punctured, and hot liquid slag
allowed to flow into the gap to soften the lower surface of the bowl.
Next Dave was able to hammer clear some of the upper edges of the
combined slag mass. Quickly moving to hook and pry through the tap
arch, the bloom popped free quite suddenly, and Dave grabbed it with
the tongs.
Again the bloom mass was moved over to the consolidation stump. With
Neil / Ken / Sam on the hammers and Dave holding, the loose mother was
knocked clear and the ragged edges compacted. The bloom was returned to
the smelter body for another heat to allow for a second compaction
(this time Ken holding and Dave now striking, with Kevin replacing Neil
on the hammer). The end result was a rough cube of metal with a total
weight of about 3100 gms. The second bloom is considerably more dense,
more in line with what would be expected in a fully successful smelt.
Unnr shovelling ore | Dumping hot ore | Smelter layout |
TIME | EVENT | ORE | CHARCOAL | AIR | ||||||
REL. | ELAP. | ADD (scoops) |
AMT (Kg) |
TOTAL (Kg) |
ADD (buckets) |
AMT (lb) |
TOTAL (lb) |
SET. | VOL. (litre/min) |
|
6:08 | Refill smelter with Charcoal | C+¾? | ||||||||
6:20 | 12 | Charcoal | 1 | 4 | 4 | |||||
6:28 | 8 | Charcoal | 1 | 4 | 8 | |||||
6:37 | 9 | Charcoal | 1 | 4 | 12 | |||||
6:37 | Ore | 1 | 0.4 | 0.4 | ||||||
6:46 | 9 | Ore | 1 | 0.4 | 0.8 | |||||
6:47 | 10 | Charcoal | 1 | 4 | 16 | |||||
6:54 | 7 | Ore | 1 | 0.4 | 1.2 | |||||
6:56 | 9 | Charcoal | 1 | 4 | 20 | |||||
7:05 | 11 | Ore | 1 | 0.4 | 1.6 | |||||
7:06 | 10 | Charcoal | 1 | 4 | 24 | |||||
7:12 | 7 | Ore - Hematite | 1 | 0.7 | 0.7 | |||||
7:13 | 7 | Charcoal | 1 | 4 | 28 | |||||
7:21 | 9 | Ore | 1 | 0.4 | 2.0 | |||||
7:21 | 9 | Charcoal | 1 | 4 | 32 | |||||
7:25 | 4 | Ore - Hematite | 1 | 0.7 | 1.4 | |||||
7:31 | 6 | Ore | 1 | 0.4 | 2.4 | |||||
7:31 | 10 | Charcoal | 1 | 4 | 36 | |||||
7:37 | 6 | Ore - Hematite | 1 | 0.7 | 2.1 | |||||
7:39 | 8 | Charcoal | 1 | 4 | 40 | |||||
7:40 | 3 | Ore | 1 | 0.4 | 2.8 | |||||
7:43 | 3 | Ore - Hematite | 1 | 0.7 | 2.8 | |||||
7:47 | 4 | Ore | 1 | 0.4 | 3.2 | |||||
7:48 | 9 | Charcoal | 1 | 4 | 44 | |||||
7:54 | 7 | Ore - Hematite | 1 | 0.7 | 3.5 | |||||
7:57 | 3 | Ore | 1 | 0.4 | 3.6 | |||||
8:00 | 3 | Ore - Hematite | 1 | 0.7 | 4.2 | |||||
8:00 | 12 | Charcoal | 1 | 4 | 48 | |||||
8:02 | 2 | Ore | 1 | 0.4 | 4.0 | |||||
8:05 | 3 | Ore - Hematite | 1 | 0.7 | 4.9 | |||||
8:06 | 6 | Charcoal | 1 | 4 | 52 | |||||
8:07 | 2 | Ore | 1 | 0.4 | 4.4 | |||||
8:08 | 1 | Ore - Hematite | 1 | 0.7 | 5.6 | |||||
8:10 | 2 | Ore | 1 | 0.4 | 4.8 | |||||
8:12 | 2 | Ore - Hematite | 1 | 0.7 | 6.3 | |||||
8:14 | 2 | Ore | 1 | 0.4 | 5.2 | |||||
8:14 | 8 | Charcoal | 1 | 4 | 56 | |||||
8:16 | 2 | Ore - Hematite | 1 | 0.7 | 7.0 | |||||
8:17 | 1 | Ore | 1 | 0.4 | 5.6 | |||||
8:19 | 2 | Ore - Hematite | 1 | 0.7 | 7.7 | |||||
8:21 | 2 | Ore | 1 | 0.4 | 6.0 | |||||
8:23 | 2 | Ore - Hematite | 1 | 0.7 | 8.4 | |||||
8:23 | 9 | Charcoal | 1 | 4 | 60 | |||||
8:25 | 2 | Ore | 1 | 0.4 | 6.4 | |||||
8:26 | 1 | Ore - Hematite | 1 | 0.7 | 9.1 | |||||
8:29 | 3 | Ore | 1 | 0.4 | 6.8 | |||||
8:31 | 2 | Ore - Hematite | 1 | 0.7 | 9.8 | |||||
8:32 | 1 | Ore | 1 | 0.4 | 7.2 | |||||
8:32 | 9 | Charcoal | 1 | 4 | 64 | |||||
8:36 | 4 | Ore - Hematite | 1 | 0.7 | 10.5 | |||||
8:37 | 1 | Ore | 1 | 0.4 | 7.6 | |||||
8:38 | 1 | Ore - Hematite | 1 | 0.7 | 11.2 | |||||
8:41 | 3 | Ore | 1 | 0.4 | 8.0 | |||||
8:43 | 11 | Charcoal | 1 | 4 | 68 | |||||
8:43 | 2 | Ore - Hematite | 1 | 0.7 | 11.9 | |||||
8:45 | 2 | Ore | 1 | 0.4 | 8.4 | |||||
8:47 | 2 | Ore | 1 | 0.4 | 8.8 | |||||
8:49 | 2 | Ore | 1 | 0.4 | 9.2 | |||||
8:50 | 1 | Ore | 1 | 0.4 | 9.6 | |||||
8:52 | 9 | Charcoal | 1 | 4 | 72 | |||||
8:53 | 3 | Ore | 1 | 0.4 | 10.0 | |||||
8:55 | 2 | Ore | 1 | 0.4 | 10.4 | |||||
8:57 | 2 | Ore | 1 | 0.4 | 10.8 | |||||
8:58 | 1 | Gromps | ||||||||
9:00 | 2 | Gromps | ||||||||
9:02 | 10 | Charcoal | 1 | 4 | 76 | |||||
9:02 | 2 | Gromps | ||||||||
9:09 | 7 | Charcoal | 1 | 4 | 80 | |||||
9:17 | 8 | Charcoal | 1 | 4 | 84 | |||||
9:25 | 8 | Charcoal | 1 | 4 | 88 | |||||
9:27 | Shock Charge | 3 | 1.2 | 12.0 | ||||||
9:33 | 6 | Charcoal | 1 | 4 | 92 |