Iron Smelt - Wareham ON - October 11, 2009
Date:October 11, 2009
Location:Wareham ON
See also: Darrell Markewitz's ironsmelting site
Team: Ken Cook, Sam Falzone, Neil Peterson, Richard Schwitzer
Premise: - 1000 years ago the norse visitors at L'anse aux meadows attempted a smelt. We plan to reproduce that smelt.
- This marked the second of four smelts in a sequence designed to test several variables currently outstanding in our knowledge of the smelt.
- The smelting area was laid out as suggested by the archaeology of L'Anse aux Meadows, more photos of the furnace hut, and a discussion of the vinland furnace.
Furnace Design
Type | Boxed Short Shaft, solid clay slabs, incontinent |
Extraction | top |
Diameter | 20 cm |
Height | 68 cm |
Volume | 21352 cm3 |
Tuyure Type | ceramic tube |
Tuyere height from base | 14 cm |
Tuyere penetration into furnace | 5 cm |
Tuyere angle | 22 deg |
Base design | natural set base cm |
Burn Details
Bellow Type | electric blower plus mechanical box bellows system |
Avg Air rate | 900 litres per minute |
Total Charcoal Mass | 43 Kg |
Avg Burn rate | 16 min per 2 Kg |
Ore Type | mixture of DD 1 / DD2 / Haematite |
Total Mass of Ore | 20.7 Kg |
Burn Duration | 4.75 Hours |
Results
Mass of Bloom | 5.6 Kg |
Bloom Type | dense soft iron |
Yield | 27% |
Notes | classic planno-convex shaped bloom |
|
Reports of all of our iron smelting efforts along with more articles and information are available on the "Iron Smelting in the Viking Age" CD from the Wareham Forge. Copies of the CD can be purchased here. |
Discussion:
Conclusions:
Photos:
|
|
|
|
Air System |
Starting build |
Adding ore |
Furnace Self-tapping |
Raw Data:
CLOCK |
ELAPSED |
EVENT |
AIR * |
CHARCOAL |
|
|
ORE |
|
|
|
|
|
UNIT |
COUNT |
TOTAL |
UNIT |
TOTAL |
|
|
|
mark |
bucket |
|
kg |
kg |
kg |
|
|
|
|
(1.76 kg) |
|
|
|
|
|
|
|
|
|
|
|
|
|
12:00 |
|
start wood splints pre-heat |
|
|
|
|
|
|
13:42 |
1:42 |
first rough charcoal added |
|
1 |
|
|
|
|
13:46 |
|
air system attached to tuyere |
|
|
|
|
|
|
13:49 |
|
air restarted |
|
|
|
|
|
|
13:50 |
|
full with rough charcoal |
|
3 |
4 |
7.04 |
|
|
13:52 |
|
switch to pump bellows only |
|
|
|
|
|
|
14:15 |
|
ignition only to + 25 cm |
|
|
|
|
|
|
14:17 |
|
addition of electric blower |
4 |
|
|
|
|
|
14:18 |
|
charcoal |
|
1 |
5 |
8.80 |
|
|
|
|
|
|
|
|
|
|
|
12:00 |
|
main sequence start |
|
|
|
|
|
|
12:19 |
:19 |
charcoal |
|
1 |
6 |
10.56 |
|
|
12:33 |
:14 |
charcoal |
|
1 |
7 |
12.32 |
|
|
12:34 |
|
air increase |
6 |
|
|
|
|
|
12:35 |
|
air increase |
8 |
1 |
5 |
8.80 |
|
|
12:43 |
:10 |
charcoal |
|
1 |
6 |
10.56 |
|
|
13:55 |
:12 |
charcoal |
|
1 |
7 |
12.32 |
|
|
13:05 |
|
air increase |
9 |
|
|
|
|
|
13:06 |
:11 |
charcoal |
|
1 |
8 |
14.08 |
|
|
13:18 |
:12 |
ore added as 2 @ 1/2 kg |
|
1 |
9 |
15.84 |
1 |
1 |
13:30 |
0:12 |
|
|
1 |
10 |
17.60 |
1 |
2 |
13:41 |
0:11 |
|
|
1 |
11 |
19.36 |
1 |
3 |
13:51 |
0:10 |
|
|
1 |
12 |
21.12 |
1 |
4 |
14:01 |
0:20 |
|
|
1 |
13 |
22.88 |
0.5 |
4.5 |
14:09 |
0:08 |
|
|
1 |
14 |
24.64 |
1.5 |
6 |
14:25 |
0:16 |
|
|
1 |
15 |
26.40 |
0.5 |
6.5 |
14:36 |
0:11 |
|
|
1 |
16 |
28.16 |
1 |
7.5 |
14:48 |
0:12 |
|
|
1 |
17 |
29.92 |
1 |
8.5 |
15:00 |
0:12 |
ore added as 3 @ 1/2 kg |
|
1 |
18 |
31.68 |
1.5 |
10 |
15:13 |
0:13 |
|
|
1 |
19 |
33.44 |
1.5 |
11.5 |
15:27 |
0:14 |
|
|
1 |
20 |
35.20 |
1.5 |
13 |
15:36 |
0:09 |
ore added as 2 @ 1/2 kg |
|
1 |
21 |
36.96 |
1 |
14 |
15:49 |
0:13 |
ore added as 4 @ 1/2 kg |
|
1 |
22 |
38.72 |
2 |
16 |
16:00 |
0:11 |
|
|
1 |
23 |
40.48 |
2 |
18 |
16:12 |
0:12 |
|
|
1 |
24 |
42.24 |
2 |
20 |
16:14 |
|
last ore addition |
|
|
|
|
0.5 |
20.5 |
|
|
start burn down |
|
|
|
|
|
|
16:42 |
|
air decrease |
6 |
|
|
|
|
|
16:44 |
|
air decrease |
4 |
|
|
0.00 |
|
|
16:45 |
|
start extraction |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
charcoal |
43 kg |
|
|
|
|
|
|
|
ore |
20.7 kg |
DD-1 |
6 kg |
|
|
|
|
|
time (main) |
4:45 |
DD-2 |
4.6 kg |
|
|
|
|
|
bloom |
5.6 kg |
Haematite |
10.1 kg |
|
|
|
|
|
yield (corrected for water) |
27% |
total Fe |
61% |
|
|
|
|
|
|
|
|
|
|
|
|
|
* AIR |
pump bellows volume |
253 L/M |
|
|
|
|
|
|
|
electric blower varies |
|
|
|
|
|
|
|
|
total volumes shown only approx. |
|
|
|
|
|
|
|
Reports of all of our iron smelting efforts along with more articles and information are available on the "Iron Smelting in the Viking Age" CD from the Wareham Forge. Copies of the CD can be purchased here. |